O
La Crosse
← La Crosse

La Crosse · issues

Civic issues

Topics getting the most attention in La Crosse public meetings, ranked by how frequently they come up.

13 issues (filtered)15 topics
LowParks Rec

Bicentennial Trail Phase 3 reroute

The steep Bicentennial Trail climb in Lower Hixon Forest would be rerouted to under 10% grade, making it safer and easier to maintain. Construction could start in early 2027 after public input.

1 mention (1 this month)Last discussed Oct 15, 2026
HighParks Rec

Loggers lease extension at Copeland Park

The city locked in the Loggers and Steam at Copeland Park through 2043 with flat $25,000 annual rent instead of per-game revenue. The Loggers now handle stadium scheduling, saving parks staff time.

1 mention (1 this month)Last discussed Oct 15, 2026
MediumParks Rec

Copeland Park shelter and bathroom project progress

Good news at Copeland Park: the downsized open-air shelter is finished and the old bathroom building is demolished. Crews are waiting on Bright Speed to relocate a fiber line before digging the new bathroom foundations.

1 mention (1 this month)Last discussed Oct 5, 2026
MediumParks Rec

Sidewalk Policy for Downtown Tree Cells

The new policy lets engineers narrow sidewalks from six feet to four feet right around a tree cell opening, so trees planted in downtown pavement have a better shot at surviving. It doesn't decide where trees go — that's a separate conversation — but the mayor questioned whether pricey downtown trees in restrictive cells are worth replacing at all.

1 mentionLast discussed Sep 21, 2026
LowParks Rec

Badger Hickey Park construction change order

The park building was shifted north to dodge flood issues, saving about $6,000 — but the contractor gets 120 extra days to finish, which prompted some resident calls about the 'delay.'

1 mentionLast discussed Sep 14, 2026
MediumParks Rec

Civic Center Park construction and funding

The park's renovation bid came in over the original $450,000 TID #11 budget, so the council added TID #17 money and awarded Fowler & Hammer a $766,662 contract to keep the project on track for a 2027 build.

3 mentionsLast discussed Sep 10, 2026
LowParks Rec

Heritage Award Property Recognition Program

A new surprise-award program thanks owners who thoughtfully maintain older homes with a letter and yard sign. Commissioners stressed it is not a historic designation to avoid confusing or alarming property owners.

1 mentionLast discussed Aug 27, 2026
LowParks Rec

Accessible water bubblers project bids over budget

Bids for installing accessible water bubblers came in over budget, and rejection of the bids was recommended — delaying the accessibility project.

2 mentionsLast discussed Aug 13, 2026
HighParks Rec

Huska Park bathroom repair vs. replacement

The park bathrooms have been closed since 2020 after fire, vandalism, and encampment damage. Repairing them now costs $175,000 versus a $500,000-plus rebuild pushed to 2030 — the committee chose the repair.

1 mentionLast discussed Aug 10, 2026
HighParks Rec

2027-2031 Parks Capital Equipment Plan

The board adopted the parks department's five-year strategic plan, which will guide how parks, recreation, and forestry are run through 2031.

2 mentionsLast discussed May 21, 2026
MediumParks Rec

Reduced hours at Goose Green Park

The board voted to limit Goose Green Park hours to 6 a.m. to 9 p.m. It passed 6-1, so most members saw a need for the change, but it wasn't unanimous.

1 mentionLast discussed May 21, 2026
MediumParks Rec

Green Island Ice Arena repairs

The dehumidification system at Green Island Ice Arena is getting repaired at the request of River City Youth Hockey, keeping the rink usable.

1 mentionLast discussed May 21, 2026
LowParks Rec

Ride with the Mayor and citywide bike rodeo

The annual Ride with the Mayor happens June 12 at 9 a.m. along the future Wagon Wheel trail, and the kids' bike rodeo is tentatively July 21. Volunteers are needed.

1 mentionLast discussed May 12, 2026